Survey Campaign Management
ASW01 — Helm Demo Project / M/V Cape Hatteras
OS Command Dashboard · Loading…
● Online
👤 · View as:
Today
Loading…
⚡ Offline mode — 3 unsync'd entries. Last sync 06:12 UTC.
32.5%
Overall coverage
496 / 1,522 km acquired
15.997
km acquired today
5 lines · DPR #38
6:46
Fisheries standby (total)
8 entanglements · 0 today
38
Days without incident
No recordable incidents
35
BBSO cards
1 open · project to date
3,684
Man-hours
96 hrs today · POB 8
Time breakdown — project to date
Operations842.5 h (55.8%)
Transit310.0 h (20.5%)
Standby — weather128.5 h (8.5%)
Mobilisation96.0 h (6.4%)
Equipment downtime22.5 h (1.5%)
Standby — fisheries6.8 h (0.4%)
Area coverage — top blocks today
AreaPlanned kmProgressToday
M1248.020.2%+4 lines
M20138.722.9%+1 line
INF13.3100%+6 infills
M1647.1100%
P273.1~100%
M1390.166.6%
M17193.617.4%
M1881.514.2%
TIE75.20%
Vessel status — DPR #38
Fuel today
52 gal
Fuel remaining
187 gal
Fuel project total
1,699 gal
Avg gal/day
44.7
Trash today
4 kg
POB
8
Weather — 2025-03-30
Time (local)WindSeas
08:00SW 15 kts2 ft
12:00W 18 kts3 ft
16:00W 14 kts2 ft
20:00NW 10 kts1 ft
Forecast: W 10–15 kts easing. Seas 1–2 ft. Good survey conditions expected.
Recent DPR activity
2025-03-30
DPR #38 — 4 lines M12, 1 line M20, 6 infills
15.997 km · EDT 1.0 h (SSS dropout)
2025-03-29
DPR #37 — M11 complete, transit
10.5 h ops · Approved
2025-03-28
DPR #36 — Standby weather AM, ops PM
6.0 h ops · 4.0 h Stby.W
2025-03-27
DPR #35 — M10 x4, M10 x4
11.0 h ops · Submitted
2025-03-26
DPR #34 — M10 mainlines
10.0 h ops · Approved
Sensor acceptance — today
Lines acquired 2025-03-30 · Area M12
MBES
All lines accepted
SSS
1 line pending QC (M1202_01)
SBP
All lines accepted
TVG
Infill flagged — M1203_01
UHRS
N/A today
Outstanding requirements
M1203_01TVG infill
M1003_01SBP infill
M1302_01SSS rerun
I3103_01Fishing gear blocking
Open actions 1 item
BBSO — Open
BSO-ASW01-035: Single winch operation without radio confirmation from party chief.
Submitted 2025-03-28 · Follow-up: JSA update required
Infill — Fishing gear blocking
I3103_01 and I3602_01 — gear still present in corridor. Party chief comments DPR #38.
Logged 2025-03-30 · FAL-009 · Scout vessel required
DWI — 38 days ✓
No recordable incidents. 4 incidents closed. 6 corrective actions — all closed.
32.5%
Overall coverage
496.1 km
Virgin lines acquired
6.1 km
Infill acquired
1.3 km
Rerun acquired
Block-by-block coverage
AreaTypePlanned kmAcquired kmInfillRerunCoverageLines todayRemaining km
Total1,522.3496.16.11.332.5%111,026.2
Lines requiring action
Line IDAreaIssueSensorPriorityNotes
M1203_01M12Infill req.TVGMediumAlt out of spec — floated for shallow water
M1302_01M13Rerun req.SSSHighSSS mosaic gap >5m — full rerun required
M1003_01M10Infill req.SBPMediumSBP penetration <20m
I3103_01M13Gear blockingAllMediumGill net present — scout vessel required pre-run
8
Entanglements
Project to date
6:46
Total downtime
hh:mm fisheries standby
2
VHF contacts
Fishing vessels contacted
4
Course deviations
Remained online
1
Comp. referrals
Under Marine Affairs review
Entanglement register
DateBlockEquipmentDmg surveyDmg gearDowntimeSev.
2025-08-11M15TVGNoneNone0:00 self-relLow
2025-08-13M11All towedNoneNone04:56High
2025-08-29INFUHRS streamerNoneNone0:00 self-relLow
2025-09-01M15TVGNoneNone0:25Low
2025-09-03M11SSS/TVGNoneBuoy line broke0:12Med
2025-10-10M19SSSNoneNone0:00 self-relLow
2025-10-18M18SSS/TVGNoneNone0:00 self-relLow
2025-10-22M17SSS/TVGNoneBuoy parted1:13Med
Standby by area
M115:08
M171:13
M150:25
M18 / M190:00
Gear type distribution
SSS/TVG combined5 interactions
Gill net3
Lobster/crab pots3
Ghost gear1
38
Days without incident
HSE headline — project to date
Total man-hours
3,684
TBTs completed
38
JSAs reviewed
148
Drills conducted
10
BBSO cards
35
Recordable incidents
0
Near misses
0
PSO observations
7
Incident register — summary
Ref.DateTypeSeverityStatus
INC-ASW01-0012025-08-13Equipment damageMedClosed
INC-ASW01-0022025-10-22Equipment damageMedClosed
INC-ASW01-0032025-12-08Safety stand-downHighClosed
INC-ASW01-0042026-02-05Equipment damageMedClosed
PSO / marine mammals — project to date
SpeciesObs.No mit.DelayShutdown
Common dolphin2110
Harbour porpoise1010
Humpback whale1100
Bottlenose dolphin1100
PAM detection2020
Grey seal1100
Total8440
Total delay time from soft-start deferrals: 35 minutes
Assessment ratings follow the standard OS framework: Poor / Adequate / Good / Excellent — as used in Mayflower Wind and SBW01 CSR/OS reports. Ratings updated by OS only.
Contractor assessment — Demo Survey Co.
MobilisationGood
Equipment performanceExcellent
Survey crew (online)Good
Processing crew (offline)Adequate
Vessel crewGood
Vessel performanceGood
HSE cultureAdequate
HSE documentationPoor
Fisheries managementAdequate
Data qualityExcellent
Line planningGood
LogisticsGood
Overall field operations Good
OS notes & recommendations
HSE documentation
BBSO tracking still driven by OS. Recommend requiring weekly PDF submission with card status. TBT and JSA reviews to be included in DPR ops diary as standard deliverable.
Infill / rerun log
Coverage analysis QC to be delegated to one designated person. Infill/rerun shapefile to use standardised fields agreed with OS during mobilisation. QGIS layer maintained as single source of record.
Fisheries planning
Gear scouting and daily tracking in nav software significantly improved after Aug. Recommend making this a contractual deliverable from day one on future projects.
Processing crew
24hr deliverables generally on time. Lagged when key personnel absent. Coverage analysis delegation needed. Recommend dedicated QC lead role for future campaigns.
Recommended for future campaigns?
Yes — with lessons learned applied
Module links — generate end-of-project report
📋

DPR log

38 DPRs · All submitted

📐

Line tracker

496 km · 15 lines pending

🎣

Fishing activity

12 interactions · 8 entanglements

🦺

HSE / incidents

4 incidents · all closed